Brian Rose

CME’s field research of existing multi-zone rooftop units greatly reduces the man-hours required to specify replacement units.  A custom PMZ has been coordinated with CME, to meet the demands of limited basement access and external static pressure requirements.  Controls modifications recommended by the Test & Balance Contractor, and incorporated into the PMZ’s, will increase comfort for all zones and satisfy ASHRAE outside air requirements. Phone conferences with CME lead to quick turnaround of selection data, reduced time required for ductwork routing.   CME’s drawings and specifications are being incorporated into our book specification, thus expediting shop drawings and placement of PMZ orders.  CME’s team spirit is inspiring, especially during overtime hours required to meet project deadlines. 

Brian Rose, Rose & Associates Engineering, Engineer